Sunday, May 10, 2009

DVD Box - Day 3

Today started with another trip to Lowe's to pick up a sheet of plywood to be used as the sides, back, and bottom of the shelves. Then it was back to the house to start measuring and preparing to cut the various pieces needed from the large sheet.

After all the cutting, which was done with a circular saw and a tad with the table saw you see in the background, I started putting all the pieces together to form the frame of the storage box. Big push for the finish should be tomorrow, as long as time is found with family coming for Mother's Day.

Stayed Tuned

No comments: